Facilities
Paint Production Center
This production center's premises covers a total area of 1000 m2, having a built facility area of 520 m2. Work activity that is realized at this location includes:
- Cleaning and degreasing.
- Shot blasting.
- Painting.
- Furnace drying.
To technologically do this activity, we possess production equipment composed of:
- Painting cabin.
- Shoot blast room.
- Painting production line with phases for washing, degreasing, painting and furnace drying.



